Using my new
"entrenchment tool", I began digging the longest hole I've
ever dug.
|
It took 5 days
(2-hrs/night) to move about 1300 cubic feet of dirt. Ugh.
|
I ran 220V
underground cable, split into 2 110V circuits, plus telephone,
cable, and a data line. Gotta have the net in the shop.
Research.
|
Here we see all
the incoming lines, then Poof! A wall and inspection plate
appear. The coaxial and network lines will run back inside the
wall at some point. All my walls can be removed with a
screwdriver.
|
The villagers
rejoiced when the flip was switched, the lights came on, and nothing
smoked.
|